Stucco Counter Flashing Roof

Wall to roof deck flashing 2020 detail.
Stucco counter flashing roof. 2 the counterflashing is depicted to be installed vertically in contact with the step flashing without a capillary break. Lay 2x4 blocks on the roof to set a consistent height for the weep screed flashing. Insert the counter flashing to the indent. Overlap between the counterflashing and step flashing is not identified figure 9.
Then add a layer of asphalt cement to the area where you will attach the flashing. Be sure that it hangs so that it overlaps with the base flashing by at least 2 inches. Seal the indent with roofing caulking so the counter flashing hangs securely. And 4 the minimum 2 in.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas. The metal flashing is formed with a hook edge and cleated on 12 centers. Flashing joints are lapped 6 in the direction of water flow. Use roofing cement to secure the counter flashing to the base flashing and the chimney.
In this case it is necessary to put on a counter flashing first stucco next overlapping the counter flashing with stucco then put on the finished roof. Flashing a nail flange window 2018 rev detail. Be sure to overlap the old felt with the new felt by a foot and secure it with nails. Slip the wall leg of the weep screed behind the existing paper.
Kick out flashing for stucco 2019 detail. Weep screed for stucco 2020 detail. Sill pan for nail flange windows 2020 detail. Check out our recommended tools right here.
Roof first or stucco first. Cantilevered deck joist stucco 2020 detail. Examples of roofs that can t be walked on are. 3 the counterflashing terminates without a hemmed drip edge.
Slate spanish tile some copper roofs and aluminum roofs. Control joint at floor line 2016 detail.